How much does a ton of stone cost?

Landscape Stone Pricing by Type

Type of StoneCost per Ton (Materials Only)
Stone Dust$30 – $145
Rock Mulch$45 – $280
Crushed Shells$50 – $85
Riprap$60 – $85

How much gravel will a ton cover?

A ton of gravel will cover approximately 100 square feet, 2 inches deep.

How much does a truckload of stone cost?

$1 – $3 Per Square Foot. The cost of gravel ranges from $10 to $50 per ton, $15 to $75 per yard, $1 to $3 per square foot, or $1,350 per truck load depending on the rock type, volume, and travel distance.

How big is a 1 ton rock?

How big is a 1 ton rock? Assuming an average weight of 165 pounds per cubic foot, a 1 ton rock has a volume of 12.1 cubic feet, a diameter of 2.85 feet, and a circumference of 9 feet.

How much does 2 tons of gravel cost?

The cost of gravel ranges from $10 to $50 per ton, $15 to $75 per yard, $1 to $3 per square foot, or $1,350 per truck load depending on the rock type, volume, and travel distance. Delivery is included up to 10 miles.

How many feet will 10 tons of gravel cover?

Using 2 inches for the depth, the following measurements are a guide to the amount of gravel coverage per ton: 1/4 to 1/2 inch gravel, 100 square feet per ton; 1/2 to 1 inch gravel, 90 square feet per ton; and 1 1/2 to 2 inches gravel, 80 square feet per ton.

How heavy is a 4 foot boulder?

The average weight of a sandstone boulder is approximately 150 pounds per cubic foot. Limestone boulders and granite boulders in most cases weigh more. They average about 175 pounds per cubic foot.

What is 20mm gravel?

20mm Gravel is ideal for surfacing pathways and drives at a relatively low cost and without the need for additional laying expertise. 20mm gravel may also be used to provide ballast for a high-strength concrete, when appropriately mixed with sand and cement.

How do I figure out how many tons of stone I need?

Length in feet x Width in feet x Depth in feet (inches divided by 12). Take the total and divide by 21.6 (the amount of cubic feet in a ton). The final figure will be the estimated amount of tons required.